What are the precautions for ultra polymer pipe equipment

2021/07/01 16:06

It is a new type of porogen to produce HDPE with prestressed corrugated pipe as raw material. Used in important tensioned prestressed concrete structures, rod insertion holes, good sealing performance, no leakage, ring stiffness, friction parameters, anti-aging, electrical corrosion, good elasticity and softness, not easy to break and gouge and build new connections Way, the connection way is more convenient. After being destroyed as a porous material, the swing arm structure becomes the last protective barrier of the prestressed concrete structure.

Why are HDPE pipe production equipment widely used in petrochemical, instrumentation, aerospace, chemical, electric power, cement, metallurgy and other industries? And this is from its own advantages. First of all, the corrugated pipe plays an irreplaceable role in the fields of medium transmission, power threading, machine tools, household appliances, etc., and it is a flame-retardant material, which is more popular.

What should I pay attention to for ultra-high polymer pipe equipment

Prestressed plastic bellows equipment mainly includes metal bellows, metal expansion joints, metal heat exchange tubes and metal hoses, etc., which are mainly used to compensate for the thermal deformation of the pipeline, shock absorption, and absorb the settlement deformation of the pipeline.

This machine is a set of prestressed plastic corrugated pipe production equipment and production line. Plastic bellows is a new type of pore-forming agent, which is widely used in the construction industry.

1. The pre-stressed plastic corrugated pipe equipment used for non-stop feeding.

2. During the use of the prestressed bellows equipment, if an abnormal situation occurs, it should be shut down immediately for inspection.

The feed of the prestressed bellows equipment should not be overloaded. The crushing process should be carried out evenly. The pressurization should be stopped immediately, and the pressurization should be performed after the machine returns to normal.